收藏本站
设为主页
我要投稿
您现在的位置: 就爱学习网 >> 英语学习 >> 行业英语 >> 求职英语 >> 英语学习正文 用户登陆 注册会员
最近更新
感官动词 + doing/to do12-09
begin(start) doing/to …12-09
mean to doing/to do12-09
be interested doing/to…12-09
be afraid doing/to do12-09
try doing/to do12-09
cease doing/to do12-09
regret doing/to do12-09
remember doing/to do12-09
forget doing/to do12-09
推荐专题

最新图文
最近推荐

广告同样精彩
电子工程师 ELECTRONICS ENGINEER
作者:佚名 来源:互联网 点击数: 更新时间:2006-6-19
页面功能:【发表评论】【加入收藏】【告诉好友】【打印此文】【关闭窗口 【字体:
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.      BACKGROUND SUMMARY   Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.      PROFESSIONAL WORK EXPERIENCE   Stevenson Data Systems,Los Angeles,CA 1981-1993   Components Evaluation Engineer 1992-1993   Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.      Design Evaluation Engineer 1990-1992   Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.      Assistant Engineer 1981-1990   Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.      EDUCATION   Bachelor of Science in Electrical Engineering   --University of Southern California 1990   Associate in Engineering Electronics   --University of Southern California 1981      Job descriptions emphasize candidate's accomploshments.   Work history is stated in reverse chronological order,with most recent employment listed first.
英语学习录入:92study    责任编辑:admin 
发表评论】【加入收藏】【告诉好友】【打印此文】【关闭窗口
  • 上一篇英语学习: 没有了

  • 下一篇英语学习:
  • 相关内容
    没有相关英语学习
    网友评论:(只显示最新10条.评论内容只代表网友观点,与本站立场无关!)
    广告同样精彩
    Copyright 2006-2008 92study.com .就爱学习网 All rights reserved.
    联系方式:Email:92study@163.com |
    免责申明:本网不承担任何由内容提供商提供的信息所引起的争议和法律责任